A place to put all the information we can find about the East Post Bridge project that was on the books for years... construction began 3/15/2010 and is scheduled to be done in October (7 months).
The bridge repair looks great and the grass is coming up from that spray stuff. The builders did a masterful job constructing this bridge. And thank you for posting the progress. The neighbors appreciate the updates.
The bridge repair looks great and the grass is coming up from that spray stuff. The builders did a masterful job constructing this bridge. And thank you for posting the progress. The neighbors appreciate the updates.
ReplyDelete