
60' below this spot is how deep they are drilling the gas line. It's radio controlled from the south end of the construction zone. They are making progress, slow but sure.
In other news, a leak has been discovered in the water main under the creekbed that runs on the east side of the bridge. Maxwell is back on site to fix it.
Thanks for the more detailed updates. You are doing a fine job.
ReplyDelete