| Yep, that's a semi full of rock driving down under the bridge, with a bulldozer behind it. |
| Wide view looking north |
| Gas line looking south |
| Gas line closeup looking south |
A place to put all the information we can find about the East Post Bridge project that was on the books for years... construction began 3/15/2010 and is scheduled to be done in October (7 months).
| Yep, that's a semi full of rock driving down under the bridge, with a bulldozer behind it. |
| Wide view looking north |
| Gas line looking south |
| Gas line closeup looking south |
No comments:
Post a Comment