Thursday, May 6, 2010

5/6/10 6:30am

The north piling is starting to peek up above ground. They dug down to
the bedrock, laid a concrete footing as the base, instead of the big
metal rods they used on the south side. There are stairs cut in to the
hole, and an I-beam used as a footbridge.