A place to put all the information we can find about the East Post Bridge project that was on the books for years... construction began 3/15/2010 and is scheduled to be done in October (7 months).
Friday, April 16, 2010
Thursday, April 15, 2010
Tuesday, April 13, 2010
Tuesday, April 6, 2010
4/6/10 New South Piling
Faux stone on both sides. Once the deck is built, this view will be
gone forever. This isn't a monumental bridge, but it's ours. Enjoy,
without having to venture in to the construction zone.
gone forever. This isn't a monumental bridge, but it's ours. Enjoy,
without having to venture in to the construction zone.
4/6/10 Update

The south piling is now built about as high as the water came in the floods of 2008.
They are using the debris from the deck as dam material to reroute the
water away from the construction. The creek is up a bit from normal
but not near flood stage. A good rising will make for construction
challenges...