A place to put all the information we can find about the East Post Bridge project that was on the books for years... construction began 3/15/2010 and is scheduled to be done in October (7 months).
Friday, April 30, 2010
4/30/10 7:30pm
The creek is up some, but not over the embankment around the new north
piling.
piling.
On the SE corner, work continues on the storm drain.
Thursday, April 29, 2010
Wednesday, April 28, 2010
4/28/10 7:30am
This is the new storm sewer on the SE corner of the bridge. The hole is
about 20' deep. Water is already creeping up the pipe from the creek.
about 20' deep. Water is already creeping up the pipe from the creek.
Friday, April 23, 2010
Wednesday, April 21, 2010
Tuesday, April 20, 2010
Saturday, April 17, 2010
4/17/10 7:45am
Daryl is poised to start ripping up some asphalt on the south side of
the bridge this morning. They moved the big yellow trailer and
generator to the north side, out of the way for the water line work.
the bridge this morning. They moved the big yellow trailer and
generator to the north side, out of the way for the water line work.
Friday, April 16, 2010
Thursday, April 15, 2010
Tuesday, April 13, 2010
Tuesday, April 6, 2010
4/6/10 New South Piling
Faux stone on both sides. Once the deck is built, this view will be
gone forever. This isn't a monumental bridge, but it's ours. Enjoy,
without having to venture in to the construction zone.
gone forever. This isn't a monumental bridge, but it's ours. Enjoy,
without having to venture in to the construction zone.
4/6/10 Update

The south piling is now built about as high as the water came in the floods of 2008.
They are using the debris from the deck as dam material to reroute the
water away from the construction. The creek is up a bit from normal
but not near flood stage. A good rising will make for construction
challenges...
Thursday, April 1, 2010